HSE - PERMIT TO WORK SAFETY CHEKLISTS
Health ,Safety & Environment



Safety Checklist No:X

 

Work Category:

 

 

X

 

 

Work Description

 

Work with Naked Flames

 

Work Permit No:

 

HAZARD ASSESSMENT by Originator. Originator to confirm the following are applicable.

 

 1.  HAZARDS IDENTIFIED   The following Hazards have been identified for the activities specified:

 

 

      Naked Flame

Hot Welding Slag/Burning Spatter

      Hot Surface above 200 deg. C

Smoke

      Flammable Materials

Tripping Hazards

      Pressurised Hose Failure

Pressurised Gas Cylinder Failure

 

 

Additional Hazards:

………………………………………………………….  ……………………………………………………….

 

2.  ARE THERE ANY HAZARDS DUE TO WORK LOCATION NOT COVERED ABOVE?

     e.g. Work at height, Overside or in Confined Spaces

    

 

YES

 

NO

 

 

 

3.  ARE THERE ANY HAZARDS DUE TO SUBSTANCES?

     If yes, ensure MSDS are available and understood.

YES

NO

 

 

 

 

4.  ARE THERE ANY HAZARDS DUE TO LIFTING OPERATIONS?

     If yes : Ensure Lifting Plan has been completed

 

YES

 

NO

 

 

 

 

5.  ARE ALL THE ABOVE HAZARDS APPLICABLE AND IS THE LIST COMPLETE?

     If no, delete Hazards not applicable and enter any additional Hazards into Section 1

 

YES

 

NO

CONTROLS                            Originator to delete any items not applicable and initial

 

6.  PERSONAL PROTECTIVE EQUIPMENT – Use the following items of personal protective  

                                                                           equipment in addition to the Standard

                                                                   Mandatory PPE (Hat, Boots, Overalls)

 

 

 

 

 

    Welder’s gloves, goggles/visors and spatter proof clothing (where required) to be worn.

 

 

    Respiratory protection type ……………… (specify type) to be worn.

 

 

 

 

 

Additional Personal Protective Equipment Controls:

 

 

 

 

 

 

 

 

 

 

 

7. PREPARATION AND RECOVERY CONTROLS – The following must be in place before 

                                                                                          work starts.

 

 

 

 

 

   Receptacles for welding rods and used stubs have been provided.

 

 

   Check flashback arrestor and non-return valve are fitted correctly before opening gas supply and  

   lighting the flame.

 

 

   Gas testing is to be carried out in hazardous areas immediately before start of Hot Work for        

   each shift.

 

 

   Flammable and combustible material and passive fire protection coating is to be removed from    

   work surface and surrounding area.

 

 

   Drains and gullies in the immediate work area are to be checked clear of all combustible material   

   and protected with fire blankets (wetted if necessary).

 

 

   Screens are to be erected to protect passing personnel.

 

 

   Fire and smoke detectors are to be inhibited for given worksite.

 

 

   Gas cylinders are to be secured in upright position in well-ventilated area and protected from

   direct heat.  Bottle keys to be secured local to Gas Regulators.

 

 

   Barriers and signs are to be erected.  Barriers are to be removed as soon as practically possible. 

   State type, i.e. Tape, chain or physical:- ………………………..

 

 

   Check that extraction/ventilation system is operational.  If ventilation system fails personnel must

   stop work and leave the confined space immediately.

 

 

   System to be isolated, de-pressurised and Isolation Certificate in place.

 

 

   Wherever possible, cables and hoses to be kept to minimum lengths, run through mouseholes,

   secured at regular intervals and kept away from ladders, walkways and wet areas.  Where not

   possible protective covers are to be fitted and warning notices posted.

 

 

   Tripping hazard to be mechanically removed or bridged and permanently marked.

 

 

   Fire Watcher to be appointed.

 

 

   Fire blanket to be provided.

 

 

   Check access and escape routes are clear at all times or alternative routes marked and the

   workforce informed.

 

 

   Check at the worksite that portable fire extinguisher of the correct type is available.

 

 

   Check the deluge system is operational and the means of manual initiation known and

   understood by all members of the work party.

 

 

   Check that a dedicated fire hose, pressurised to the nozzle is available.  Frost precautions are to

   be taken where appropriate.

 

 

 

 

 

Additional Preparation and Recovery Controls:

 

 

 

 

 

 

 

 


8.  EXECUTION CONTROLS – The following must be observed during the work.

 

 

 

 

 

   When gas welding or cutting in a vessel, torches are to be removed when not in use.

 

 

   Check an authorised igniter is available to light torch

 

 

   PICWS/Firewatcher to check other side of wall/work area.  Before starting or re-starting   

   and during execution of work.

 

 

   Check that all air intakes are protected from gas/fumes/air borne particles etc.

 

 

   Only appropriately designed transportation devices are to be used for the movement of gas

   cylinders round the platform/plant.

 

 

   During work breaks, gas cylinder and hose valves to be closed and hoses de-pressurised.  Gas

   cylinders to be returned to specified area when empty.

 

 

   Hot Work Permit and Gas Test Certificate to be on-site whenever work is underway.

 

 

   Flammable substances not to be used within 1 metre of hot surfaces.

 

 

   Hoses are not to be kinked during operation.

 

 

   Portable Gas Detector to be at worksite at all times.

 

 

 

 

 

 

Additional Execution Controls:

 

 

 

 

 

 

 

 

 

 

 

9.  CONTROLS IN PLACE

 

 

 

 

 

All the above controls are understood and are in place. Toolbox talk to take place prior to commencement of work.

 

 

 

 

 

Name of PICWS (Person in charge of Worksite)……………………………………………………….

 

 

 

 

 

Signature:……………………………………………………………………………………………………

 

 

 

 

 

Date: ……………………………….

 

 